| 1999/07/01 |
SW18 |
Spencer Park - incorrect shared-use sign on pavement near junction with Windmill Road |
July 1999 |
WBC |
 |
Removed in late July 2003 |
| 1999/08/01 |
SW18 |
Twilley Street - one-way system causes safety concerns at Kimber Road /Garratt Lane /Swaffield Road crossroads |
Aug 1999 |
WBC |
 |
Summer 2003 - Council says right-turn filter for southbound traffic at junction of Garratt Lane /Kimber Road will not be possible |
| 2000/04/01 |
SW18 |
Trinity Road /Wandsworth Common West Side - partially-completed route means southbound cyclists are led out onto one-way street against flow of traffic |
April 2000 |
WBC |
 |
Oct 2000 - told will be implemented in 2001 |
| 2000/04/02 |
SW18 |
Furmage Street and St Ann's Crescent - one-way working reduces permeability for cyclists |
April 2000 |
WBC |
 |
|
| 2000/04/03 |
SW4 |
Clapham Common North Side - pinch points adjacent to central reservation cause problems for cyclists travelling east [TfL responsibility] |
April 2000 |
WBC |
 |
|
| 2000/04/04 |
SW8 |
Queenstown Road - pinch points adjacent to central reservation outside Marco Polo building cause problems for cyclists |
April 2000 |
WBC |
 |
|
| 2000/04/05 |
Borough-wide |
Cycle stands - regular removal of abandoned bikes |
April 2000 |
WBC |
 |
Procedures put in place but patchy implementation needs monitoring |
| 2000/04/06 |
SW18 |
Kimber Road - excessive wait at toucan crossing |
April 2000 |
WBC |
 |
Adjusted in 2001 |
| 2000/10/01 |
SW18 |
Earlsfield Station - additional cycle parking needed [SWT responsibility] |
Oct 2000 |
WBC |
 |
Done in Spring 2002 |
| 2000/10/02 |
SW8 |
Ravenet Street /Queenstown Road - signing at junction is confusing |
Oct 2000 |
WBC |
 |
|
| 2000/10/03 |
Borough-wide |
Better method for fixing 'fingerpost' signs |
Oct 2000 |
WBC |
 |
|
| 2000/10/04 |
SW18 |
"The Tonsleys" - one-way working reduces permeability for cyclists |
Oct 2000 |
WBC |
 |
|
| 2001/01/01 |
SW18 |
Frogmore /Putney Bridge Road - difficulties for cyclists turning right from Frogmore into Putney Bridge Road |
Jan 2001 |
WBC |
 |
Summer 2002 - technical consultancy have been contracted to redesign crossing Summer 2003 - re-design has been sent to LCN |
| 2001/01/02 |
SW18 |
North Passage - two-way working requested for cyclists |
Jan 2001 |
WBC |
 |
|
| 2001/01/03 |
SW18 |
Short stretch of Spencer Park opposite Spencer Road (cut-through onto Wandsworth Common North Side) - contra-flow working for cyclists requested |
Jan 2001 |
WBC |
 |
|
| 2001/10/01 |
SW18 |
East Hill - signs in Trinity Road area assume cycle routes which have not yet been built |
Oct 2001 |
WBC |
 |
|
| 2001/10/02 |
SW18 |
East Hill /Birdhurst Road - tree roots and bollard obstructing cycle lane |
Oct 2001 |
WBC |
 |
Repaved in financial year 2003/4 |
| 2001/10/03 |
SW18 |
Borrodaile Road - missing kerb ramp on cycle route |
Oct 2001 |
WBC |
 |
Done in Oct 2002 |
| 2001/10/04 |
SW18 |
Allfarthing Lane - humps need maintenance |
Oct 2001 |
WBC |
 |
|
| 2001/10/05 |
SW11 |
Granfield Street - CPZ-related obstruction to previously installed cycle lane /facility |
Oct 2001 |
WBC |
 |
February 2003 - kerb build-outs installed |
| 2001/10/06 |
SW18 |
Clapham Junction - existing ASL removed outside Arding & Hobbs |
Oct 2001 |
WBC |
 |
ASLs re-instated in financial year 2003/4 |
| 2001/10/07 |
SW18 |
Jews Row - cycle route signage not amended to show route is now one-way |
Oct 2001 |
WBC |
 |
Done in Autumn 2003 |
| 2002/01/01 |
SW18 |
Garratt Lane - cycle racks requested on wide pavement, south of Earlsfield Station |
Jan 2002 |
WBC |
 |
Done in Spring 2002 |
| 2002/01/02 |
SW18 |
Magdalen Road - additional cycle parking requested between Earlsfield Road junction & library |
Jan 2002 |
WBC |
 |
Done in Spring 2002 |
| 2002/01/03 |
SW18 |
Magdalen Road - dangerous pinch points with narrow, dangerous cycle 'diversions' |
Jan 2002 |
WBC |
 |
Autumn 2002 - no funding available for this in current year Autumn 2003 - Martin Hoare has completed a design to remove chicanes & islands and to install speed tables |
| 2002/01/04 |
SW18 |
Ram Street - short green phase for northbound cyclists crossing Wandsworth High Street to enter Ram Street [TfL responsibility] |
Jan 2002 |
WBC |
 |
Bus /cycle lane completed in Dec 2003 |
| 2002/01/05 |
SW18 |
Poorly designed cycle entry point from Fairfield Street to Barchard Street [TfL responsibility] |
Jan 2002 |
WBC |
 |
|
| 2002/01/06 |
SW11 |
Clapham Junction station - bike gullies requested on stairs [SWT responsibility] |
Jan 2002 |
WBC |
 |
|
| 2002/04/01 |
SW15 |
Wandsworth Park - right of way for cyclists requested |
April 2002 |
WBC |
 |
August 2004 - "No cycling" signs removed |
| 2002/04/02 |
SW11 |
Este Road /Wayford Street - CPZ-related obstruction to previously installed cycle lane /facility |
April 2002 |
WBC |
 |
Summer 2002 - council has approved remedial measures |
| 2002/04/03 |
SW17 |
Junction of Burntwood Lane /Garratt Lane - difficult turn out of Burntwood Lane |
April 2002 |
WBC |
 |
Summer 2002 - signalled junction with advanced stop line completed Autumn 2002 - parking bays closest to junction have been removed and TfL are to re-examine signal phase Jan 2003 - right turn filter from Garratt Lane into Burntwood Lane to be put in on every sequence of lights Summer 2003 - right turn filter from Garratt Lane into Burntwood Lane now only operates during peak hours |
| 2002/04/04 |
SW8 |
Queenstown Road - damaged road surface [TfL responsibility] |
April 2002 |
WBC |
 |
|
| 2002/04/05 |
SW15 |
Slipway by Asda on A3 - poor visibility when using shared cycle /pedestrian crossing |
April 2002 |
WBC |
 |
|
| 2002/04/06 |
SW18 |
Smugglers Way - stop line is too far forward on signal-controlled cycle crossing into Old York Road |
April 2002 |
WBC |
 |
Summer 2002 - passed to engineers at TfL who are doing safety audit |
| 2002/04/07 |
SW18 |
Wandsworth Bridge - 2-way off-road cycle path requested on west side |
April 2002 |
WBC |
 |
Autumn 2003 - started getting costings and estimates |
| 2002/04/08 |
SW11 |
Bridges Court - short, useless cycle lane near Battersea Heliport |
April 2002 |
WBC |
 |
|
| 2002/04/09 |
SW11 |
Grant Road - traffic calming requested |
April 2002 |
WBC |
 |
Speed cushion installed in March 2004 |
| 2002/04/10 |
SW18 |
Trinity Road - badly-placed "cyclists dismount" sign on west side of toucan crossing near Routh Road |
April 2002 |
WBC |
 |
Signs changed in financial year 2003/4 |
| 2002/07/01 |
SW12 |
Wandsworth Common Station - wheeling ramp requested to assist cyclists on stairways [South Central responsibility] |
July 2002 |
WBC |
 |
|
| 2002/07/02 |
SW17 |
Bellevue Road /St James's Drive - difficult junction for cyclists travelling straight ahead from Nightingale Lane to Bellevue Road when held at traffic lights because of narrow left-turn lane and left filter on lights |
July 2002 |
WBC |
 |
Autumn 2002 - plans for advanced stop line have been drawn up but with left-hand lead-in lane, WCC requested ASLs on all parts of this junction Summer 2003 - project has been passed to Dave Cochrane's highway engineering team |
| 2002/07/03 |
SW17 |
Bellevue Road - more cycle parking requested |
July 2002 |
WBC |
 |
|
| 2002/07/04 |
SW18 |
Burr Road /Merton Road - on-road cycle symbol on the short contra-flow cycle lane is upside-down |
July 2002 |
WBC |
 |
Summer 2003 - this has been rectified |
| 2002/07/05 |
SW11 |
Battersea Park Road - marked cycle lane rejoins traffic flow at sharp, dangerous angle [TfL responsibility] |
July 2002 |
WBC |
 |
Done in summer 2003 |
| 2002/07/06 |
SW18 |
King George's Park - water collects on raised strip separating cycle path from footpath |
July 2002 |
WBC |
 |
Early 2005 - grooves cut in brick white line |
| 2002/07/07 |
SW18 |
King George's Park - misaligned tactile paving |
July 2002 |
WBC |
 |
Early 2005 - tactile paving re-aligned |
| 2002/07/08 |
SW18 |
Wendlesworth Estate - incorrect cycle signage |
July 2002 |
WBC |
 |
|
| 2002/10/01 |
SW18 |
York Road near Wandsworth Bridge roundabout - cycle path on north side is positioned too close to roadside railings |
Oct 2002 |
WBC |
 |
|
| 2002/10/02 |
SW18 |
York Road - 2-way cycle path requested on north side from Mendip Road to roundabout |
Oct 2002 |
WBC |
 |
|
| 2002/10/03 |
SW18 |
Marl Road /Smugglers Way - danger when waiting to turn out to left or right from Marl Road |
Oct 2002 |
WBC |
 |
Summer 2003 - traffic island probably not possible but ghost island might be possible |
| 2002/10/04 |
SW18 |
King George's Park - tree roots causing damage to cycle path at base of ramp which links 2 parts of park |
Oct 2002 |
WBC |
 |
Early 2005 - to be done with routine tree root work in the park. |
| 2002/10/05 |
SW18 |
King George's Park - badly-filled hole in cycle path near junction with Kimber Road |
Oct 2002 |
WBC |
 |
Filled in March 2004 |
| 2002/10/06 |
SW11 |
Wye Street /York Road - cyclists dismount sign at toucan crossing |
Oct 2002 |
WBC |
 |
|
| 2002/10/07 |
SW18 |
Trewint Bridge to Ravensbury Road - missing link in Wandle Trail route |
Oct 2002 |
WBC |
 |
|
| 2003/01/01 |
SW15 |
Putney High Street turning into Putney Bridge Road - cycle lane is tight on corner of Putney Bridge Road |
Jan 2003 |
WBC |
 |
Feasibility work starting in financial year 2003/4 |
| 2003/01/02 |
SW15 |
Eastern end of Putney Embankment - cycle lane needs re-profiling |
Jan 2003 |
WBC |
 |
Summer 2003 - to be implemented in a "few months" |
| 2003/01/03 |
SW15 |
Putney Embankment near junction with Lower Richmond Road - poor surfacing of cycle path |
Jan 2003 |
WBC |
 |
Summer 2003 - to be implemented in a "few months" |
| 2003/01/04 |
SW15 |
Putney Embankment - further to the west signage and surface of cycle lane are deficient |
Jan 2003 |
WBC |
 |
|
| 2003/01/05 |
SW16 |
Moyser Road /Thrale Road area - more cycle stands requested |
Jan 2003 |
WBC |
 |
Installed in Feb 2004 |
| 2003/01/06 |
SW4 |
Clapham Common North Side - traffic lights are unresponsive to cyclists travelling west on shared bus /cycle contraflow |
Jan 2003 |
WBC |
 |
Note: recurring problem |
| 2003/01/07 |
SW4 |
Clapham Common North Side /Elspeth Road - difficult right turn into Elspeth Road [TfL responsibility] |
Jan 2003 |
WBC |
 |
|
| 2003/07/01 |
SW18 |
Chivalry Road - contra-flow working for cyclists requested |
July 2003 |
WBC |
 |
|
| 2003/07/02 |
SW11 |
Bolingbroke Grove near Battersea Rise - cycle lane requested on outer lane of wide pavement |
July 2003 |
WBC |
 |
|
| 2003/07/03 |
SW11 |
MacDuff Road /Battersea Park Road - no cycle light on opposite side of Battersea Park Road |
July 2003 |
WBC |
 |
|
| 2003/07/04 |
SW11 |
MacDuff Road /Battersea Park Road - stop line is a long way back from Battersea Park Road |
July 2003 |
WBC |
 |
|
| 2003/07/05 |
SW11 |
MacDuff Road /Battersea Park Road - cycle light in MacDuff Road is obscured by zone sign |
July 2003 |
WBC |
 |
Autumn 2003 - Martin Hoare agreed to move parking sign |
| 2003/07/06 |
SW11 |
Strasburg Road - blockage of cycle lane |
July 2003 |
WBC |
 |
Autumn 2003 - work will be done eventually |
| 2003/08/01 |
SW18 |
Mapleton Road - traffic light situated in centre of cycle lane |
Aug 2003 |
WBC |
 |
June 2004 - traffic light moved |
| 2003/10/01 |
SW8 |
Silverthorne Road near Broughton Street junction - poor road surface caused by spillages, wear & tear, poor quality repairs |
Oct 2003 |
WBC |
 |
|
| 2003/10/02 |
SW8 |
Dickens Street and Rule Street - regular pavement and on-road sweeping required |
Oct 2003 |
WBC |
 |
|
| 2003/10/03 |
SW8 |
Broughton Street - uneven road surface, especially just in front of ASL |
Oct 2003 |
WBC |
 |
|
| 2003/10/04 |
SW8 |
Broughton Street - traffic lights are bent so they face away from traffic |
Oct 2003 |
WBC |
 |
|
| 2003/10/05 |
SW8 |
Broughton Street - "no through road" signs do not say "Cyclists excepted" |
Oct 2003 |
WBC |
 |
|
| 2003/10/06 |
SW8 |
Queenstown Road from Wandsworth Road to Battersea Park Road - high traffic speed |
Oct 2003 |
WBC |
 |
|
| 2003/10/07 |
SW8 |
Queenstown Road /Broughton Street - narrow road squeezes cyclists when lights are green |
Oct 2003 |
WBC |
 |
|
| 2003/10/08 |
SW8 |
Queenstown Road immediately north of Wandsworth Road /Lavender Hill - parked cars make the road too narrow (would be better if bus lane started earlier) |
Oct 2003 |
WBC |
 |
|
| 2003/10/09 |
SW8 |
Queenstown Road /Silverthorne Road - profile of junction means southbound cars turn into Silverthorne Road at high speed and without consideration for cyclists and pedestrians |
Oct 2003 |
WBC |
 |
|
| 2003/10/10 |
SW8 |
Queenstown Road /Silverthorne Road - brick surfacing is very steep close to left kerb for southbound cyclists |
Oct 2003 |
WBC |
 |
|
| 2003/10/11 |
SW8 |
Queenstown Road /Silverthorne Road - road surface near the kerb has subsided |
Oct 2003 |
WBC |
 |
|
| 2003/10/12 |
SW8 |
Ravenet Street /Queenstown Road - difficult right turn out of cycle path |
Oct 2003 |
WBC |
 |
|
| 2003/10/13 |
SW8 |
Queenstown Road - shared use requested on pavement under bridge |
Oct 2003 |
WBC |
 |
Oct 2003 - Council engineers agreed that this is technically feasible |
| 2003/10/14 |
SW8 |
Queenstown Road - toucan crossing requested outside the Victoria pub |
Oct 2003 |
WBC |
 |
|
| 2003/10/15 |
SW8 |
Queenstown Road - area under bridge needs regular sweeping |
Oct 2003 |
WBC |
 |
|
| 2003/10/16 |
SW8 |
Southolm Street /Queenstown Road - difficult right turn onto Queenstown Road |
Oct 2003 |
WBC |
 |
|
| 2003/10/17 |
SW8 |
Ravenet Street - painted lines of cycle lane need to be extended to Queenstown Road to discourage parking |
Oct 2003 |
WBC |
 |
|
| 2003/10/18 |
SW11 |
Ravenet Street - area under bridge needs regular sweeping |
Oct 2003 |
WBC |
 |
|
| 2003/10/19 |
SW11 |
Ravenet Street - incorrect "no cycling" sign at Strasburg Road end of bridge |
Oct 2003 |
WBC |
 |
Corrected in Oct /Nov 2003 |
| 2003/10/20 |
SW8 |
Queenstown Road from Battersea Park Road to Queen's Circus - two lanes of traffic leaves no room for cyclists |
Oct 2003 |
WBC |
 |
|
| 2003/10/21 |
SW8 |
Stewarts Road - alternating railings at bottom of steps make access difficult or impossible on the flat |
Oct 2003 |
WBC |
 |
|
| 2003/10/22 |
SW8 |
Thessaly Road - entrance blocked by alternating railings |
Oct 2003 |
WBC |
 |
|
| 2003/10/23 |
SW11 |
MacDuff Road /Battersea Park Road - long wait for cyclists at cycle crossing |
Oct 2003 |
WBC |
 |
|
| 2003/10/24 |
SW8 |
Queenstown Road /Carriage Drive North - junction can be hazardous travelling northbound on cycle path |
Oct 2003 |
WBC |
 |
|
| 2003/10/25 |
SW8 |
Chelsea Bridge - northbound cycle path requested on pavement |
Oct 2003 |
WBC |
 |
|
| 2003/10/26 |
SW8 |
Queenstown Road from Queen's Circus to Chelsea Bridge - southbound cycle path is discountinuous, obstructed by trees etc and uneven |
Oct 2003 |
WBC |
 |
|
| 2003/10/27 |
SW18 |
Burr Road - request for length of double yellow lines at cycle gap to be increased |
Oct 2003 |
WBC |
 |
|
| 2003/10/28 |
SW11 |
Falcon Road - cycle racks requested outside the Job Centre /Fitness First |
Oct 2003 |
WBC |
 |
|
| 2003/10/29 |
SW11 |
Falcon Road - cycle racks requested to replace railings outside the PCSU building |
Oct 2003 |
WBC |
 |
|
| 2003/10/30 |
SW11 |
Severus Road - cycle racks requested outside the Grand |
Oct 2003 |
WBC |
 |
|
| 2003/10/31 |
SW11 |
St John's Hill - cycle racks requested adjacent to the bus stop near Severus Road |
Oct 2003 |
WBC |
 |
|
| 2003/10/32 |
SW11 |
Junction of Beauchamp Road /St John's Road - cycle racks requested on the build-out |
Oct 2003 |
WBC |
 |
|
| 2003/10/33 |
SW11 |
Somerfield on Northcote Road - cycle racks requested outside |
Oct 2003 |
WBC |
 |
|
| 2003/10/34 |
SW11 |
Northcote Road - cycle racks requested on the built-out corners |
Oct 2003 |
WBC |
 |
|
| 2003/10/35 |
SW11 |
Prested Road /St John's Hill - cycle racks requested at or near junction |
Oct 2003 |
WBC |
 |
|
| 2003/10/36 |
SW18 |
Sainsbury's on Garratt Lane - cycle racks requested outside |
Oct 2003 |
WBC |
 |
|
| 2003/10/37 |
SW11 |
Somerfield on Battersea Park Road - cycle racks requested opposite the door |
Oct 2003 |
WBC |
 |
|
| 2003/10/38 |
SW8 |
Battersea Park Station - cycle racks requested in a convenient location for the station (either inside ticket hall or outside without pigeon droppings) |
Oct 2003 |
WBC |
 |
|
| 2003/10/39 |
SW11 |
Battersea Bridge Road - cycle racks requested between Battersea Church Road and Westfield Road |
Oct 2003 |
WBC |
 |
|
| 2003/10/40 |
SW11 |
Battersea Church Road - cycle racks requested near St Mary's church |
Oct 2003 |
WBC |
 |
|
| 2003/10/41 |
SW11 |
Battersea Square - more cycle racks requested in well-used locations |
Oct 2003 |
WBC |
 |
|
| 2003/10/42 |
SW11 |
Latchmere Road /Battersea Park Road - cycle racks requested outside John D Wood on the corner (with complementary signage outside the Spar and the Latchmere Theatre) |
Oct 2003 |
WBC |
 |
|
| 2003/10/43 |
SW11 |
Homebase on York Road - cycle racks requested by the door |
Oct 2003 |
WBC |
 |
|
| 2003/10/44 |
SW11 |
Old York Road - cycle racks requested in a convenient location for the shops |
Oct 2003 |
WBC |
 |
|
| 2003/10/45 |
SW11 |
Battersea Reference Library - cycle racks requested on the forecourt |
Oct 2003 |
WBC |
 |
|
| 2003/10/46 |
SW11 |
Junction of Eland Road /Lavender Hill - cycle racks requested outside Foxtons |
Oct 2003 |
WBC |
 |
|
| 2003/10/47 |
SW18 |
Triangle opposite Wandsworth Police Station - cycle racks requested |
Oct 2003 |
WBC |
 |
|
| 2003/10/48 |
SW18 |
Triangle outside Book House on East Hill - cycle racks requested |
Oct 2003 |
WBC |
 |
|
| 2003/10/49 |
SW18 |
Merton Road - cycle racks requested on one of the corners outside the Sikh Gurdwara |
Oct 2003 |
WBC |
 |
|
| 2003/10/50 |
SW15 |
Putney Crematorium - cycle racks requested close to the car parks |
Oct 2003 |
WBC |
 |
|
| 2003/10/51 |
SW15 |
Putney Cinema - cycle racks requested at or near the cinema |
Oct 2003 |
WBC |
 |
|
| 2003/10/52 |
SW18 |
Allfarthing Lane - cycle racks requested outside Michael's Newsagent |
Oct 2003 |
WBC |
 |
Installed in Feb 2004 |
| 2003/10/53 |
SW18 |
Barmouth Road - cycle racks requested outside local shops |
Oct 2003 |
WBC |
 |
Installed in Feb 2004 |
| 2003/10/54 |
SW18 |
Trinity Road - cycle racks requested outside local shops /post office opposite the County Arms |
Oct 2003 |
WBC |
 |
|
| 2003/10/55 |
SW18 |
Armoury Way - cycle racks requested outside the Crane public house |
Oct 2003 |
WBC |
 |
|
| 2003/10/56 |
SW12 |
Nightingale Lane - cycle racks requested outside the Nightingale Pub |
Oct 2003 |
WBC |
 |
|
| 2003/10/57 |
SW12 |
Junction of Ramsden Road /Nightingale Lane - cycle racks requested next to the row of shops |
Oct 2003 |
WBC |
 |
Installed in Feb 2004 |
| 2003/10/58 |
SW15 |
Outside Foxtons in Putney and by Putney Station - signs needed pointing to the little-used cycle racks around the corner |
Oct 2003 |
WBC |
 |
|
| 2003/10/59 |
Borough-wide |
Cycle racks - requested the consideration of cycle stands in the place of railings and bollards |
Oct 2003 |
WBC |
 |
|
| 2004/04/01 |
SW11 |
Winstanley Road entrance to Clapham Junction - abandoned bikes on racks |
April 2004 |
SWT |
 |
July 2004 - bikes removed |
| 2004/05/01 |
SW11 |
Carriage Drive North - steep speed bumps in Battersea Park |
May 2004 |
WBC |
 |
Sept 2004 - humps removed, review underway so continued monitoring is required |
| 2004/05/02 |
SW18 |
King George's Park - pothole on cycle path |
May 2004 |
WBC |
 |
Filled in in June 2004 |
| 2004/05/03 |
SW18 |
King George's Park - rough surface on cycle path near the Earlsfield end of the park |
May 2004 |
WBC |
 |
Resurfaced in early 2005 |
| 2004/05/04 |
SW18 |
King George's Park - pedestrians use cycle ramp because pedestrian ramp is so steep |
May 2004 |
WBC |
 |
Early 2005 - pedestrian ramp has been levelled further, although it is imperceptible |